The ISM Manufacturing PMI explained: what the monthly index says, and the parts a buyer should actually read
Every month the Institute for Supply Management surveys US purchasing executives and publishes the Manufacturing PMI, one of the most watched readings of the economy. The headline number gets the attention. For a small company that buys materials, the more useful parts are underneath: supplier deliveries, prices and the lead times purchasing managers report.
The ISM Manufacturing PMI, published by the Institute for Supply Management on the first business day of each month, is one of the most watched readings of the US economy. It is built from a survey of purchasing and supply executives at manufacturing companies, asking whether things got better, worse or stayed the same. The headline shows the direction of manufacturing; a company that buys materials needs the components underneath, which affect orders, prices and delivery times.
How is the PMI built?
According to ISM, the Manufacturing PMI is a composite of five diffusion indexes with equal weights: new orders, production, employment, supplier deliveries and inventories. A diffusion index counts how many respondents report an increase, no change or a decrease. A PMI reading above 50 percent indicates that manufacturing is generally expanding; below 50, contracting. In September 2026 the PMI was 54.5%, with new orders at 55.3% and production at 56.7%.
Why is Supplier Deliveries the other way round?
It is the only index ISM inverts: a reading above 50 means deliveries are slower, which usually happens when demand is strong and suppliers are busy. In September 2026 it stood at 59.0%, its tenth month of slowing deliveries. For a buyer managing supply risk, it is one of the most useful lines in the report.
What else should a buyer read?
- Prices. The share of purchasing managers paying more for raw materials, and which industries report increases. In September 2026, 58.6% of respondents reported higher prices.
- Lead times. ISM's "buying policy" section reports average commitment lead times for production materials, maintenance supplies and capital equipment; in September 2026 they were 84, 49 and 176 days. What those numbers mean for a small buyer is in supplier lead times in 2026.
- The industry lists. Which industries report slower deliveries and higher prices, in order. If your suppliers' industry is near the top, expect longer waits.
How should a small company use it?
As an early warning, not a forecast for your own orders. When supplier deliveries and lead times rise for several months, order long-lead items earlier, hold more buffer stock and give suppliers forecasts. When they fall, there may be room to negotiate. The method for your own supply chain is in how to reduce supplier lead times, and a second supplier for the parts that matter is in second source supplier strategy.
What are its limits?
It is a survey of direction, not a measure of size: a reading of 59 does not mean deliveries are 59% slower. It covers US manufacturing, not your specific suppliers abroad. And a small buyer's own lead times can differ from the averages, because supplier priorities, order size and product type vary.
What this means for a buyer
Read three lines each month: supplier deliveries, prices and lead times. Act when they move in the same direction for two or three months running. Working through your own lead times and suppliers with you is the work on the operations and suppliers page.