01
A buyer wants a thousand units. Your line is built for ten.
Your engineers hand-built the prototype from whatever was on the shelf. A thousand units need parts you can buy again, suppliers with known lead times and a line someone has measured.
How I run it
- Rework the BOM so every part has a second source and a lead time you can plan around.
- Measure what the line really produces and what limits it, before anyone raises money for a bigger building.
- Give production a veto over design choices that can’t be built at volume.
- Name one owner for each handover, set up the ERP, and take production through ISO 9001 or AS9100 certification.
64%line utilization I found there: 16 built, capacity 25
For four years I was head of product and operations at a Czech aircraft manufacturer, a C-level role covering its UAV programs, sales, suppliers and production. It built 16 aircraft a year on capacity for 25, and the fix was finding what held back the other nine, not a new hall.
02
It works on your range and fails the buyer’s acceptance test.
A buyer describes the mission: the range, the threat, the weather, who operates it. Between that and the build, requirements get guessed, merged or lost, and it shows up in acceptance tests or when a tender asks how you meet each line of the spec.
How I run it
- Write down with the buyer and the operators how the system is used: conditions, threats, and what it does when the link or GPS is lost.
- Turn that into requirements an engineer can build to and someone can check: range, endurance, payload, the link under jamming, temperature.
- Break the system into subsystems with one owner each, and build the verification matrix: for every requirement, how it will be proven and what the buyer accepts. Keep both under change control.
- Check the spec against the buyer before the build: NDAA and Blue UAS for US programs, MIL-STD-810 and 461, the tender terms in Ukraine or an allied country.
Engineering sign-off and certification stay with your engineers and the certifying authority. I make sure what they sign off is what the buyer asked for.
03
One late supplier stops the line. One wrong partner stops the deal.
The first suppliers come through the founder’s contacts and the first partners through introductions. After the pilot, a single-source part sets the pace of the company, and a partner picked on a handshake decides what you can sell, where and on what terms.
How I run it
- Find and qualify suppliers and contract manufacturers in the US, Europe or Ukraine on price, lead time, quality and how they handle problems.
- Negotiate terms, minimum orders and delivery schedules you can plan production around.
- Find the partners who open a market, such as distributors, integrators and joint-venture partners, and set the relationship up to last past the first order.
- Step in when a relationship stalls, and get both sides to the next step.
3long-term international partnerships built for an aircraft dealer
For a Czech defence group, a one-off sale became a partnership with local production rights. For an aircraft dealer I built three long-term international partnerships in place of one-off resale deals. For an aviation business, a parts shop became a planned supply and technology-transfer partner for a plant building 150 unmanned aircraft a year.
04
One ITAR part in the BOM decides where you can sell the whole system.
Export rules follow the parts. One US-controlled component can put the whole system under ITAR, and a buyer in Europe or Ukraine then waits months for a license or picks another product. US rules work the other way too: the Pentagon can’t buy drones whose key parts come from China or other restricted countries. Most companies find out from the buyer.
How I run it
- Map the BOM against ITAR, EAR and NDAA before the design freezes: which parts are controlled and which markets each one closes.
- Build ITAR-free and NDAA-compliant sourcing, with second sources for the markets you sell in.
- Run the compliance program and the export and import permits in the US, Europe and Ukraine with your counsel, so licenses sit inside the sales plan.
- Set the rules for sharing technical data with partners and teams abroad before the first file goes out.
Classification rulings and legal opinions come from your export counsel. I run the work around them, so the paperwork keeps pace with the sales.
05
A program office is interested. Your company can’t sign yet.
Before a US government buyer can pay you, the company has to exist in its systems: registration, cybersecurity, the right contract vehicle. Each step is simple and slow, and companies start after the first serious conversation, which is weeks too late.
How I run it
- Register the company: SAM.gov, UEI, CAGE code and the NAICS codes buyers search by.
- Get ready for CMMC and for handling controlled unclassified information.
- Pick the path: SBIR or STTR, an OTA, a DIU solicitation or a direct sale, and prepare the proposal evaluators score.
- Line up production and quality, so you can deliver what you win.
06
Your first test worked. Now you need data from real use.
Range tests check what you expected. Operators in Ukraine find what shakes loose, where the link drops under jamming and how batteries behave in the cold. Buyers ask whether the system has been used for real.
How I run it
- Set up testing with operators in Ukraine who run systems like yours every day (the routes in, step by step).
- Agree up front what gets logged: each failure, the conditions, and what operators changed or worked around.
- Turn the logs into a ranked list for your engineers, then test the next version, keeping field data and sales claims apart.
Getting hardware there legally is its own step. I run the export permits with your counsel and build the testing schedule around the license.
07
You need buyers in Ukraine and Europe.
Ukraine buys what has worked in combat. European governments pay Ukrainian producers directly and back joint ventures with them. Both want a local partner and, more and more, local production.
How I run it
- Map who actually buys in Ukraine and in the European countries funding it, down to the program (who signs, in what order).
- Find the Ukrainian or European partner who can produce locally and agree what each side brings, with technology transfer and local production rights when a straight sale stalls.
- Build the positioning, compliance language and proof each type of buyer asks for.
08
The hardware works. The numbers around it don’t yet.
Your unit cost at volume is a guess, the deck has no production curve, and the sales cycle stalls the moment a committee asks how you scale.
How I run it
- Position the product around the buyer’s situation, and name it once, the same way from the website to the tender response.
- Price it for volume: unit cost at 100, 1,000 and 10,000 units, and the working capital each step needs.
- Map the committee: who signs, what each needs to see, and how long each step takes.
- Prepare investor and partner materials, and the answers a diligence team will ask for.
09
You need engineering capacity you don’t have in-house.
Ukrainian teams design, test and change drones, counter-drone and EW systems in weeks, with feedback from the units that use them. I work with them; most companies outside Ukraine have no way in.
How I run it
- Connect you with vetted Ukrainian teams that work on your class of system, and scope the work: a design review, a specific improvement, or adapting to a new threat or supplier.
- Agree who owns what: the IP you bring, the IP you build together, and the rules on moving technology across borders.
- Tie each round of work to a change in your product, and review it before the next one.
Contracts and IP ownership are drafted by counsel on both sides. I make sure the commercial terms are agreed before they start.
Legal opinions stay with your counsel and engineering sign-off with your engineers. I run the work around them, so neither holds up the deal.