How to vet a manufacturer: eight checks before you pay the deposit
The deposit is the moment a supplier relationship becomes expensive to leave. Before it, you can walk away at the cost of a few emails; after it, every problem is a negotiation. Here are the eight checks I run before a client pays a new manufacturer anything, and the two that catch most of the trouble.
How to vet a manufacturer is a question worth answering before the deposit, not after it. Until you pay, a supplier who turns out to be wrong costs you a few emails and a few weeks. Once the deposit is paid, the same supplier costs you a negotiation from a weak position, and sometimes the deposit itself.
Eight checks cover most of the risk. Most suppliers pass most of them. The point is to find the one that fails while leaving is still cheap.
Why does the deposit change everything?
Because it moves the leverage. Before payment, the supplier wants your order. After payment, you want your money's worth, and the supplier knows that you will usually accept a late or imperfect order rather than start again. A thirty or fifty percent deposit on a first order is normal; paying it to a company you have not checked is not.
1. Is the company you are paying the one you are contracting with?
Check that three names match: the company on the contract, the company on the invoice and the name on the bank account. Look the company up in its country's business register and confirm it exists, how long it has existed and who owns it. A mismatch is not always fraud, since groups sometimes invoice through a sister company, but it always needs a written explanation before you pay.
2. Is it the factory, or a trader?
Many companies that present themselves as manufacturers are trading companies that place your order with a factory you never see. That is not wrong in itself; a good trading company can manage quality and logistics you could not. But you should know which one you are dealing with, because it changes who controls quality, who owns the relationship with the factory and what happens to your tooling and drawings.
Ask directly. Ask for the factory address, then check it: satellite images, a video call walking the production floor, or a visit. If a company cannot show you where your product will be made, you do not know who controls the manufacturing, whatever its website says.
3. Have you seen the production line?
A visit is best. A live video call, with the camera moving where you ask rather than where they point it, is the minimum. Look for the machines your product needs, work in progress for other customers, how parts are stored and labelled, and whether inspection happens on the line or at the end. Watch how the work flows, not only the machines: is the layout sensible, and do workers have what they need at their station, or do they walk across the shop to fetch a part? Ergonomics drives how well the operation runs, and the operation drives cost and quality. A factory that will not show its floor before a first order will not be easier to deal with after it.
4. Did the sample come from production?
Samples made in a sample room by the best technician are not evidence of what the line will produce. Ask for a sample made on the production equipment you will be using, from the materials that will be used, and keep it as the reference that the order will be checked against. Agree in writing that the order must match the approved sample.
5. Will a customer of your size talk to you?
References from large customers prove the factory can serve large customers. Ask for one or two customers close to your size and volume, ideally in your market, and call them. Ask three questions: did deliveries arrive when promised, what happened the first time something went wrong, and would they order again.
6. Is everything that matters in the contract?
A purchase order alone rarely covers the protections you need. Before the deposit, the agreement should cover the specification and approved sample, quantities and prices, the shipping term, delivery dates and what happens if they slip, how the goods will be inspected and what happens to rejected units, payment milestones, whether any part of your order may be subcontracted, how design changes are approved, and who owns the intellectual property and tooling. If the product or its technical data is export-controlled, that belongs in the agreement too, and in front of counsel. When manufacturing in another country, have counsel there check enforceability; a contract the supplier's courts will not enforce is a letter of intent. The full list of terms is in the contract manufacturing agreement checklist.
7. Who owns the tooling and the drawings?
If you pay for moulds, dies or fixtures, the contract should say they are yours, where they are kept, and that the supplier must release them if you move production. The same applies to your drawings and specifications: the supplier may use them only to make your product. Without those lines, the supplier owns your ability to leave, and the cheapest quote can become the most expensive relationship. How to price tooling into the quote comparison is in how to compare supplier quotes.
8. Have you confirmed the bank details by phone?
This is the check that saves the most money for the least effort. A common fraud intercepts the email thread between buyer and supplier and sends new bank details just before payment, on a convincing invoice. The FBI's Internet Crime Complaint Center recorded 24,768 business email compromise complaints in 2025, with reported losses of just over $3 billion.
The rule is simple: never act on a change of bank details received by email. Call the supplier on a number you already had, not the one in the email, and confirm the account with a person you know; if you can, confirm it through a second channel as well, because a compromised mailbox can sit behind a familiar name. Do it again before every payment to a new account.
Which checks catch most of the trouble?
The first and the eighth: who exactly you are paying, and whether the bank account is really theirs. They are also the two that owners skip, because they feel like paperwork rather than engineering. Checks two to five catch the suppliers who are real but wrong for you; checks six and seven decide how much a problem costs when it comes.
What should you do if a supplier fails one?
It depends on which. A name mismatch with a good explanation in writing can be fine. A refusal to show the factory, a sample that differs from production or pressure to pay to a new account are reasons to stop. The cost of stopping before a deposit is a few weeks. The cost after is usually the deposit, and the weeks as well. If a relationship with a supplier has already stalled, the route back is in how to restart a stalled supplier deal.
What the checks leave you with
A supplier you know is real, a contract that says what you are buying and who owns what, and a payment route that cannot be redirected. That is the starting point for running the supplier well, which is the subject of the supplier scorecard. If you would rather have the supplier found and checked with you, that is the work on the operations and suppliers page.